Most Dallas homes built before 2000 have 3-tab shingles that crack and curl after 12-15 summers. Hot humid air bakes the granules off and lets water under the felt. We tear to the deck, replace bad plywood, and add ice-and-water shield along eaves before new 30-year shingles go down. Permits from Dallas code enforcement take 2-3 days and we pull them for every full replacement.
Hail hits hard in North Dallas and Lake Highlands. Dents in metal or granule loss on asphalt mean insurance often covers a full roof replacement instead of patch work. We document every hit with photos and work straight with adjusters so homeowners are not stuck with out-of-pocket surprises.
Cheap crews skip the drip edge and ridge vent. That traps heat in the attic and shortens shingle life by years. We run drip edge on every eave and rake, install balanced intake and exhaust vents, and leave the job with a 10-year workmanship note you can inspect.
Downtown Dallas, Uptown, Oak Lawn, Deep Ellum, Bishop Arts, East Dallas and Lake Highlands all have different roof pitches and access limits. We bring lifts for two-story homes and stage materials in tight alleys so neighbors are not blocked. Work starts at 7am and finishes before dark when weather allows.
Roof Replacement Services We Offer
✓Full Roof Replacement Dallas
Complete tear-off and new roof on single-family homes, finished in 2-4 days with 30-year shingles.
✓Emergency Roof Replacement
Same-day or next-day full replacement after major leaks or storm damage, 24/7 dispatch.
✓Commercial Roof Replacement
Flat or low-slope TPO or modified bitumen replacement on small retail and office buildings, scheduled around business hours.
✓Asphalt Shingle Roof Replacement
Upgrade from 3-tab to architectural shingles with new underlayment on homes in North Dallas and East Dallas.
✓Metal Roof Replacement
Switch to standing seam metal over existing deck on homes near the Dallas Arboretum or Klyde Warren Park.
Roof Replacement Cost in Dallas, TX
| Service | Typical Range | What Affects It |
|---|---|---|
| Asphalt shingle roof replacement on 1,500 sq ft house | $6,500–$9,800 | Includes tear-off, basic plywood fixes, and 30-year shingles. |
| Metal roof replacement on 2,000 sq ft house | $11,000–$16,500 | Standing seam, extra for steep pitch or difficult access. |
| Emergency roof replacement after storm | $8,000–$14,000 | Rush scheduling and weekend work add cost. |
| Commercial flat roof replacement 3,000 sq ft | $18,000–$27,000 | TPO membrane, insulation boards, and drain work. |
| Free roof replacement estimate | Free | Call 24/7 or stop by 5124 Sharp St, Dallas, TX 75247. Mon-Sat 7am-7pm. |
Ranges are typical for Dallas, TX and confirmed with an exact written quote before any work starts.
How it works
- 1
Site Check and Measure
We walk the roof and attic same day, check decking, and give a written scope. Takes 45 minutes.
- 2
Permit and Material Order
We file the permit and order shingles or metal. Lead time 1-3 days in Dallas.
- 3
Tear Off and Deck Repair
Old roof comes off, bad plywood replaced, ice shield laid. One day on most homes.
- 4
New Roof Install
Underlayment, drip edge, shingles or metal, vents, and flashing go on. 1-3 days depending on size.
- 5
Final Walk and Cleanup
We check every seam with you and haul debris. Job done same afternoon.
Pricing
Prices shift with roof size, access, and material. Most Dallas homes land between $5,000 and $15,000.